PRE-APPLICATION MEETING:
It strongly endorsed the proprietor or applicant timetable a Pre-Application assembly earlier than filing a domain plan application. County Pre-Application tactics may be determined here; go to the internet site at www.fcwsa.org. A Technical Review Committee (TRC) assembly is scheduled after the first submission remarks are obtained. This assembly is to be had to discuss any comments the applicant desires to have rationalization or talk in detail. Please see TRC Meeting Dates to decide the date of the assembly primarily based on the recognition of the application.
STEP 1: COUNTY COMPLETENESS REVIEW
This evaluation is needed before the first Submission of a domain plan to Community Development. You will want the subsequent to be able to publish for Minimum Submission Review:
- Minimum Submission Review Application
- Code of Development Checklist
- Two (2) copies of the Site Plan
- Other substances as decided throughout Pre-Application Meeting
- Derives contains pdf of all requirements
STEP 2: Verification of site
We aim to approve 메이저놀이터 plans after evaluations; however, the number of assessments can be more significant if branch remark saren’tab solutely addressed previous to Submission. After every review, the County will offer written evaluation remarks to the applicant and proprietor. After the primary assessment, a Technical Review Meeting may be held. This assembly offers the applicant an opportunity to meet with reviewers to talk about obtained remarks. A resubmission charge is charged for any evaluation required past the 2evaluations& signature sets.
Required Submission substances are indexed for every Submission.
- 1st Submission:
- Land Development Application with unique signatures
- Site Plan Fee Calculation Sheet or Code of Development Fee Calculation Sheet
- Application Fee
- Fauquier County Acceptance letter
- VDOT Site Plan 메이저놀이터 Checklist
- One reproduction of licensed word to adjoining belongings owners
- Flash Drive containing man or woman PDFs of all submission substances – do now no longer encompass any economic information
- second Submission. Note:
- The second Submission should be submitted within 35 days of the TRC assembly. Two 30 day extensions can be given with the aid of user requests. Submissions are now no longer meeting the closing date and require an extra $two hundred submitting charge.
- A remark reaction letter addressing every evaluated agency’s remarks
- Revised plans with adjustments highlighted on every reproduction five Easement Plats with two deeds with unique signatures
- The Bond Estimate Review spreadsheet in Microsoft Excel layout was inserted into the web page plan.
- Flash Drive containing man or woman PDFs of all resubmission substances – do now no longer encompass any economic information (i.e., reproduction of assessments or the charge calculation sheet)
- third& Subsequent Submissions
- The third and next submissions should be submitted inside 21 days of receiving remarks from the County County. One 30 day extension can be given with the aid of using a request. Bids no longer meet the closing date and require an extra $two hundred submitting charge.
- $six hundred Flat Fee
- A remark reaction letter addressing every evaluated agency’s remarks
- Revised plans with adjustments highlighted on every reproduction Flash Drive containing man or woman PDFs of all resubmission substances – do now no longer encompass any economic information
- Signature Sets
- eight copies of the revised plan