Comprehensive traffic impact assessments Canberra wide are required for development projects that will produce substantial additional traffic. The evaluation assists in determining whether the planned construction project necessitates improvements to existing facilities or public transit systems.
Without a clear picture of the types of traffic movements, as well as their size, pacing, and location, there’s a chance that they’ll cause safety issues and unexpected congestion where the construction meets the path. This article focuses on some of the most critical aspects of TIA in order to guide applicants in the right direction.
Traffic Impact Assessment
A traffic impact assessment (TIA) is a technical examination of traffic problems and safety concerns associated with a particular development. The main goal of a TIA report is to determine whether a specific construction project would affect the protection and efficiency of nearby roads.
Moreover, the study paves the way for further research and development of traffic management strategies to help reduce traffic congestion. The TIA takes into account not only traffic impacts, such as road network productivity and protection, but also the effects on all road users, including public transportation riders, pedestrians, and cyclists. Both operational and physical effects on transportation networks are considered in the TIA.
The Primary Objective of TIA
The Statement of Environmental Effects, which must be included with the Development Application, must include a TIA. The main goal of the TIA report is to help the Council and the State Government decide if the planned development can be accepted with conditions or whether it has serious implications that justify the application being denied.
Documents Required for Submission
The TIA report, along with any related traffic modelling files needed to properly evaluate the TIA, should be submitted to the Council as part of the Development Application. Other than that, there are other documents mentioned below that need to be submitted.
- Current status of transportation.
- Development details.
- Methods used to evaluate traffic generation.
- The traffic generation summary table.
- Distribution of traffic in the field, as well as the assignment assumptions and traffic volume figures.
- Traffic safety risks assessment.
- Public transport impacts assessment.
- Pedestrian and cyclist impact assessment.
- Traffic volume, intersection layouts, signal phasing data, and specifics of any additional traffic infrastructure works undertaken to mitigate development impacts are all inputs into the intersection evaluation.
- Brief description of the development’s planned construction work.
- Other facts and conclusions that the investor thinks are important to consider when evaluating the consultant’s evaluation methods and results.
The Bottom Line
A detailed Traffic Impact Assessment report is a time-consuming job. You’ll need professional help to grasp the scope of the project and the need for a comprehensive TIA study. If your project has the ability to generate additional traffic, whether in Sydney, Melbourne, or any other Australian area, the best way to go about the planning application is to utilise the expertise of traffic impact assessments consultants Canberra.