You probably plan to get a swimming pool installation in Houston and wonder how long it will take to build a pool so you can leap in and enjoy it. In that case, this blog will address what you should consider when getting a pool built and how these factors can affect the build time. By the end, you’ll know what factors can increase the build time and how to pick the right pool contractor for your project.
How Long Does It Take to Install a Pool?
Pool installation can be an expensive and time-consuming process. But it doesn’t take forever to build a pool. An average pool can be made between six and ten weeks from start to finish. Your project may be finished before this period in some cases. It may take as long as 13-14 weeks in other cases. The building time of your pool largely depends on the following factors:
- Finished size
- Ease of access to the area
- Type of pool you want
- Length of the legal and design process
- Amount of customized features you requested
Let’s further discuss each of these factors.
Permission for the Pool Construction
Before starting the construction, your pool builder will require permission for the pool. It may take around 1-8 weeks. First, your pool builder will create a pool design and needs your approval. This part of the process depends on whether you want alterations to the original design. Next, your municipality will need to fill and approve the permits. Your contractor will include the pool design in the legal work. This period is not really in the hands of your contractor.
Excavating the hole
The next part of the pool building process is digging the hole your new pool will sit in. Excavation is often a quick procedure and takes hardly a week. It may take longer if your future pool area is difficult to access for the builder.
Plumbing, electrical, and steel components installation
Before installing the pool, other things such as plumbing, steel, and electrical components need to be installed that allow your pool to run efficiently. This part of the process is quick and takes one or two weeks to complete. It may take some extra time if the pool is complex and large.
Pool installation
Finally, it’s time for pool installation. But the time this part of the process takes can vary wildly depending on the type of pool you want. For example, contractors can quickly install fiberglass and vinyl pools, but concrete ones can take longer.
Finishing Touches
Once your pool is installed, it’s time for some finishing touches, and your pool is ready to go. Apart from your unique request, finishing touches include landscaping and building the decking. It may also involve installing custom lighting and waterfalls and other extra features you requested during the designing process.
Choosing the Right Pool Contractor
To ensure the pool building process goes smooth and quick, you should choose the right pool contractor. Try asking about the pricing, experience, licensing, and expected time frame to finish the job. For pool installation in Houston, contact Town & Country Pools and get one step closer to your dream pool. We have been in the field since 1973 and are well-versed in local zoning and construction laws. Contact us today!