In order to have a quality hydraulic project, the dedication goes beyond the quality of the materials, which are also important. The watchword is: planning!
A good hydraulic project is very important, after all, nobody wants to have to break walls after a finished work to solve problems that could have been avoided in advance, right?
But what we still see out there are cases where the hydraulic project is done by an unqualified professional and executed by the same professional and with the same level of knowledge on the subject.
The execution of a good hydraulic project is essential to avoid headaches and damage to your work. Read on and discover what can’t be missing from this project.
Combine performance, economy and sustainability
The combination of these three items is the foundation for a good plumbing project for homes. This is exactly why the project needs to be done and executed by a professional who understands the subject. Forget the “let me do it” or the famous “gambiarra”.
System performance must meet all requirements without having to affect other issues such as excessive noise from poorly designed pipelines. for Plumbing Consultation
In economic terms, the hydraulic project has to reduce costs, but without forgetting to think in the long term. Some materials and solutions can even cost more, however, over the years they generate a lot of savings.
Sustainability, on the other hand, seeks to minimize the impacts of civil construction. Ecologically correct constructions already rank a good hydraulic project as one of the work’s priorities.
Hydraulic Project Information:
The hydraulic project must contain all the information relevant to its installation. Even if you are not an expert, you have to have documented everything that will be in this stage of construction. Demand from those who designed the project to include details of all subsystems, such as: cold water pipes, hot water, sewage, rainwater and water reuse. Basic design patterns include: floor plans, sewer details, water isometrics, vertical water and sewer schematics, and specific details.
Usage and maintenance issues that are not considered often present extra problems and costs in the future. Not only in the future, but during the construction of the house, with oversizing of pipes, just to cite one example.
Look for a qualified company with experience in the subject. The company’s engineer must offer subsidies and suggestions for what the market has to offer. But, don’t forget to monitor everything closely, since the beginning of the work.
Remember: a good hydraulic design has to be considered as a whole. Its performance and service life need to last more than 20 years.
Pressure from the street:
The water pressure coming from the street cannot be left out of the items to be considered either. If the pressure is low, having to fill the water tank will take a long time, the water in the shower drops at a reduced rate, dishwashers and washing machines do not fulfill their functions properly, etc.
In case of too high pressure, the hydraulic design will need wider and stronger tubes and you will pay more attention to the splices and connections.
The pipes:
Doubts also often appear when choosing tubes and connections. The best known and most used material is PVC. However, the market offers more options: copper, more used for the transport of heated water, galvanized steel and cross-linked polyethylene, recently introduced in the domestic market.