Sidewalk violations are notices issued by the Department of Transport intimating a damaged sidewalk. After the issuance, the notice is filed with the County Clerk for the borough of the concerned property. The notice remains active in the clerk’s office until the repair is done and it is acknowledged. Violations are tagged with the property block and lot, and with a single block, there can be only one active violation. If any block has more than one active violation, only the most recent violation is considered, and the rest are superseded. Sidewalk violation removal in NYC can get hard to get rid of at times.
A Superseded sidewalk violation
Whenever a single block gets more than one sidewalk violation, then the older sidewalk violation is superseded. Therefore, the only violation that needs attention is the latest one that can have any ignored defects and require repair.
Risks of having an open sidewalk violation
If there is ignorance for a long time and the repair is not done within the time period of 45 days, DOT itself will assign the contractor themselves for the repair work. The bill, however, will be forwarded to the lot and will be added to the property tax. If you fail to fulfill the requirements of violations, later on, you may face difficulty during property transactions. The owner will also be responsible if anyone is injured.
Correcting a sidewalk violation
-
Hire an expert Contractor
Hire a contractor who is aware of DOT specifications regarding sidewalk repair work. For DCA licensing or other information, we contact us.
-
Request an Inspection Permit
You can call your contractor and request an inspection permit for your sidewalk. It is essential for the work and is also required in the final steps. The permit charges may change with time and are determined according to the area in feet. A permit is a must for repair work.
-
Dial for Dismissal Request
After you are done with the work, call and request to get your violation removed. Make sure that you have saved your permit because it will be helpful later on. DOT will ask you for it and then send an inspector. If the inspector is satisfied, the violation will be dismissed. Time frame is essential here as well, and you need to get your violation dismissed within 45 days.
Pay your bill, or you’ll be in trouble
If the city is doing the job on your behalf, make sure that you pay them back in 90 days. After the deadline, a lien will be issued on your property, and it will be removed until you clear the bill. The city also offers a payment plan or installment offer if you cannot pay the bill in one go.
Keep your sidewalks in check so that you are saved from violations and unwanted stress.If somehow you have been served with a notice, call our sidewalk repair company to get all the help you need.
Trustworthy DOT violation removal services in New York City
Owners are responsible for keeping an eye on their sidewalks or being held accountable for any kind of damage to citizens. If any cracks or damages appear, then the DOT will issue a violation notice. In order to avoid stress and further legal proceedings, get in touch with our NYC sidewalk violation removal professionals. Our team of experts is entrusted with the responsibilities of DOT sidewalk violation removal services. We have exceptional skills and have a prestigious position in the construction market. We can assist you in:
- Sidewalk contractor NYC
- Approved DOT expedition
- Approved DOT Architect
- Approved Permit application filing
- Approved DOT certificate
Our years of experience handling sidewalk violations such as collapsed sidewalks, uneven sidewalks, improper slope, and more make us pro in our work. When we take work, we make sure that you get the proper relief, durability, and long-lasting solution. The property retains its value only when no extra work is done repeatedly over and over again. DOT gets in the matter when you fail to serve the department of transportation regulations on sidewalks. So, entrust your property work to us; we work for the customer’s gratification.